4211 Community Events


What's Happening in the 4211 and Surrounding Areas

4211 Community Calendar

community-Calendar-(1).png
 

Hinterland Feast

Friday 26 October, 5pm - 9pm
Country Paradise Parklands
231 Beaudesert Nerang Rd, Nerang QLD 4211
FREE

It will be a superbly yummy night with a host of food trucks, great entertainment, plus plenty of free activities for the kids. And a bar, did I mention the bar? These are beautiful nights at one of the city’s best kept secrets right here in Nerang. A Division 5 event.

 

Clearwater Neighbourhood Community Day

Sunday, 7th November 
10.30am - 1:30pm
Carol Moore Park at the baseball club
Dugandan Street, Nerang
FREE

A fun day for all residents of Clearwater/Clearview to come along and play with snakes, have a free BBQ lunch, have some fun with the kids and have a chat with neighbours and folks from the Neighbourhood Watch team. Sponsored by Division 5.



nerang-and-surrounds-community-projects.png

Equestrian Projects

Funded by Division 5
We’ve got a good focus on equestrian activities in Division 5 and some recent projects include:

A new Round Yard at Tom Rose Park, Wandin Street Nerang.

A new Round Yard at Darwalla Reserve, Nathanvale.
(These round yards are really good quality features and will provide a lot of great opportunity for riders and horses alike to learn skills safely.)

Healing Hooves at Country Paradise (Nerang) has purchased relocatable barriers/stalls to ensure the horses and ponies are able to be relocated and kept safe during flood events at Country Paradise.
Funds have been allocated to construct a HQ for Healing Hooves in recognition of the amazing and impacting work they do for people in need of our support.
 

New Learn to Swim facility at Nerang Pool!

Yes, this year we will see the complete replacement of the existing learn-to-swim facility and it is going to be a knock-out. 

At a cost of $950,000, the new facility will be approximately 15m x 8m and enclosed in a purpose built facility, with a ramp access. The water temperature will be 32 degrees and this is good for both swimming and pool-based therapy programs and activities. Although not strictly hydrotherapy, which is normally 34 degrees or more, the facility can provide similar benefits. An evaluation is being undertaken to determine the ideal depth to cater for both needs. 

Construction is anticipated from April 2019 and will take about six months.
 

New Water Play facility in Nerang

Planning work has continued during 2017-18 to determine the best location for and features of the new water play park. For those who are unaware, this facility would be conceptually based on the rockpools in the Broadwater parklands – free access, low-risk, fun and wet! It is proposed this will be in Bischof Park in the centre of Nerang.

Planning work has been slower than anticipated but $100,000 has been secured to finalise the detailed engineering design this coming year. $1.3 million is available for construction in 2019 (before summer).

Watch this space for more details!

nerang-waterplay-park.jpg

My Centre Nerang Re-Development

Big re-development of My Centre shopping centre on Gilston Road.

Approval has been granted for a major redevelopment and expansion. After numerous meetings and close assessment over the past 12 months or more,  approval is to be issued under Delegated Authority (ie by Council officers). This approval stems from the original approval granted in 2008. The site has been earmarked for development since the early 1990s.

My Centre is currently 9,140 sq metres. This expansion will introduce an additional 17,525 sq metres! 
You can read more about this on our blog.

mycentre-redevelopment-site.JPG



roadworks-in-the-4211-area.png

Roadworks in the 4211 and Gold Coast Areas

Ashmore Road Works

Advancetown Road Works

Carrara Road Works

Canungra Road Works

Coburg Road, Canungra
Long Term Flooding 
Road closed to all traffic in all directions 
Do not drive in flood waters

Lamington National Park Road
Load limit restriction of 6.0 tonne - between Sarabah Road and O'Reilly due to Earlier flooding.
All lanes affected, all directions No delays expected. Observe signage
 

Clagiraba Road Works

Gilston Road Works

Guanaba Road Works

Highland Park Road Works

Lower Beechmont Road Works

Beechmont Road

Road damage as a result of Severe Tropical Cyclone Debbie. Temporary traffic signals in place.
Lane or lanes reduced, delays expected in both directions.

17 Apr 2018 to 30 Nov 2018
Monday to Saturday, 6 AM to 6 PM Lane or lanes reduced
What to expect Delays expected (during active hours)

Extra information Temporary traffic signals at three locations. Day works Monday to Friday with occasional Saturday work.


Maudsland Road Works

Molendinar Road Works

Nerang Road Works

Mortensen Road, Nerang (from number 8 to number 87).

Works will be completed during the day from Monday to Friday, between 7am and 6pm.

As part of our road reconstruction program, we are carrying out asphalt resurfacing works on Mortensen Road, Nerang.  Works will take place on both the west and east bound lanes.

Construction details

  • reconstruct 800 metres of road
  • replace kerb and channel
  • upgrade stormwater grates.

Lane closures will be required and traffic management will be in place. One lane will remain open to allow through traffic and access to side streets. Please slow down and take extra care in the area.

Beaudesert Nerang Road (State Route 90)
Intermittent roadworks associated with private development near 167 Beaudesert-Nerang Road.
02 Jul 2018 to 07 Dec 2018
Monday to Friday, 7 AM to 6 PM Lane or lanes reduced

Springbrook Road Works

Gold Coast-Springbrook Road: restoration works
Restoration works to permanently repair the damage sustained on Gold Coast-Springbrook Road during the wet weather event associated with ex-severe Tropical Cyclone Debbie in March 2017. The volume and intensity of the rainfall caused significant damage to slope stability, with 112 recorded locations of landslips, above and below the road. 

Transport and Main Roads are finalising solutions to permanently repair approximately 30 critical sites and a team of specialised designers has been engaged.
Transport and Main Roads is committed to restoring full access for the community as soon as possible.
Pine Creek Road, western connection, will remain the detour route to Springbrook.

Springbrook Road
15 tonne load limit between Repeater Station Road and Boy Ull Road due to culvert damage under the road.
No delays expected, Observe signage

Natural Bridge Road Works

Nerang Murwillumbah Road
One lane only under giveway signage due to earlier flooding.No delays expected, Observe signage

Pacific Pines Road Works

Worongary Road Works

Wongawallan Road Works